Jacket and turbine installation at the Seagreen offshore wind farm appears to have halted for the time being.
No jacket or turbine is being installed, as the vessel Saipem 7000 is on a yard visit in Rotterdam and Wind Orca is on its way to Moray East to perform maintenance work. The installation pause appears to be a short break before activities are expected to resume again. The project still needs to install least 12 suction bucket jackets and 13 turbines.